Deep foundation pit concrete pouring process
The invention discloses a deep foundation pit concrete pouring process, and relates to the technical field of building construction. According to the technical scheme, the deep foundation pit concrete pouring process comprises the steps that S1, an area where a foundation pit is located is drawn on...
Saved in:
Main Authors | , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
21.09.2021
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention discloses a deep foundation pit concrete pouring process, and relates to the technical field of building construction. According to the technical scheme, the deep foundation pit concrete pouring process comprises the steps that S1, an area where a foundation pit is located is drawn on the ground; S2, a retention wall is arranged around the area where the foundation pit is located; S3, the foundation pit is excavated, when the foundation pit is excavated to the designed height of a waist beam, the waist beam is arranged, downward excavation continues till excavation of the foundation pit is completed, and a foundation pit inclined strut is arranged according to needs; S4, a guide rail is fixedly installed outside the retention wall, the guide rail surrounds the foundation pit by a circle, a receiving hopper capable of sliding along the guide rail is fixedly installed on the guide rail, and the receiving hopper is used for receiving the poured concrete; and S5, the receiving hopper is connected to |
---|---|
Bibliography: | Application Number: CN202110745726 |