Regional integrated energy system optimization scheduling method and device and terminal equipment
The invention is suitable for the technical field of power grid planning, and provides a regional integrated energy system optimization scheduling method and device and terminal equipment, and the method comprises the steps: obtaining energy supply data and energy consumption data of a target region...
Saved in:
Main Authors | , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
14.09.2021
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention is suitable for the technical field of power grid planning, and provides a regional integrated energy system optimization scheduling method and device and terminal equipment, and the method comprises the steps: obtaining energy supply data and energy consumption data of a target regional integrated energy system; establishing a multi-energy network model and a load side demand characteristic model of the integrated energy system of the target area based on the energy supply data and the energy consumption data; and based on the multi-energy network model and the load side demand characteristic model, establishing an optimal scheduling scheme of the integrated energy system in the target area. The regional integrated energy system optimization scheduling method provided by the invention can fully consider the system characteristics, effectively reduce the cost in the operation process of the regional integrated energy system, improve the coordination matching degree between the user side and the |
---|---|
Bibliography: | Application Number: CN202110803470 |