Fabricated prestress energy dissipation retaining wall structure and method for quickly repairing soil landslide

The invention discloses a fabricated prestress energy dissipation retaining wall structure. The fabricated prestress energy dissipation retaining wall structure comprises a base, straight bars, connecting bars, steel bar mechanical connectors and prestress anchor lock connectors, wherein steel bars...

Full description

Saved in:
Bibliographic Details
Main Authors WU SHUAIFENG, WEI RAN, XIAO JIANZHANG, ZHANG LEI, SUN LIMING, XU YONGFU, XIE DINGSONG, LI WEICHAO, YAN JUN, LIU CHUANXIN, QU AIYU, CAI HONG
Format Patent
LanguageChinese
English
Published 23.07.2021
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a fabricated prestress energy dissipation retaining wall structure. The fabricated prestress energy dissipation retaining wall structure comprises a base, straight bars, connecting bars, steel bar mechanical connectors and prestress anchor lock connectors, wherein steel bars are arranged at the top of the base, the straight bars and the connecting bars are connected through the steel bar mechanical connectors, and the prestress anchor lock connectors are arranged on the two sides of the base correspondingly. The method for quickly repairing a soil landslide comprises the following steps that S1, a site is leveled, a retaining wall base is installed, meanwhile, micro piles are constructed in front of a retaining wall, and anchor rods are constructed in a side slope; S2, the connecting bars are quickly installed through the mechanical connectors; S3, retaining wall prefabricated parts are installed; and S4, S1 to S3 are repeated until the retaining wall is installed, and the anti-sliding
Bibliography:Application Number: CN202110528459