Cover

Loading…
More Information
Summary:The invention belongs to the field of power systems, and provides a power system state parallel estimation method and system. The method comprises the following steps: acquiring an electrical wiring diagram and measurement configuration of a power system, constructing a corresponding block information matrix network diagram, numbering the block information matrix network diagram by adopting a minimum length algorithm, and forming a directed factor diagram by taking minimum injection elements as a target; constructing a road tree according to the directed factor graph, and dividing nodes with the same depth in the road tree into the same parallel task; and iteratively solving the power system state corresponding to the sub-task in each parallel task based on the measurement equation of the power grid state estimation and the divided parallel tasks. 本发明属于电力系统领域,提供了一种电力系统状态并行估计方法及系统。其中,该方法包括获取电力系统的电气接线图及量测配置,构建相应的分块信息矩阵网络图,采用最小长度算法对分块信息矩阵网络图进行编号,以最少注入元为目标,形成有向因子图;根据有向因子图构建道路树,将道路树中的深度相同的节点划分为同一并行任务;基于电网状态估计的量测方程
Bibliography:Application Number: CN202110371487