Tunnel construction process
The invention relates to the technical field of tunnel engineering, and particularly relates to a tunnel construction process. The tunnel construction process comprises the following steps that S1, control measurement is conducted; S2, advance support construction is conducted, specifically, advance...
Saved in:
Main Authors | , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
25.05.2021
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention relates to the technical field of tunnel engineering, and particularly relates to a tunnel construction process. The tunnel construction process comprises the following steps that S1, control measurement is conducted; S2, advance support construction is conducted, specifically, advance support is conducted on shallow burying, a tunnel opening, weak surrounding rock and a layer rock interbedding section through advance anchor rods, single-layer and double-layer advance small guide rods and an advance pipe shed according to the geological condition of surrounding rock; S3, tunnel body excavation is conducted, specifically, a V-level surrounding rock reinforcing section of a tunnel inlet section is excavated through a middle partition wall method; S4, primary support is conducted; S5, inverted arch and filling construction is conducted; and S6, tunnel waterproof and drainage system construction is conducted and comprises tunnel waterproof and drainage construction and counter-slope drainage constru |
---|---|
Bibliography: | Application Number: CN202110208466 |