Pre-anchoring rapid tunneling construction method for high-ground-stress large-deformation tunnel

The invention discloses a pre-anchoring rapid tunneling construction method for a high-ground-stress large-deformation tunnel. The pre-anchoring rapid tunneling construction method for the high-ground-stress large-deformation tunnel can greatly improve construction efficiency of the high-ground-stre...

Full description

Saved in:
Bibliographic Details
Main Authors NIU GUODONG, WEI YONGXING, JIAO KANGJIE, TAO WEIMING, QIN XIAOLIN, HUO JIANXUN, CHEN SIYU, FANG QIANBAO
Format Patent
LanguageChinese
English
Published 30.04.2021
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a pre-anchoring rapid tunneling construction method for a high-ground-stress large-deformation tunnel. The pre-anchoring rapid tunneling construction method for the high-ground-stress large-deformation tunnel can greatly improve construction efficiency of the high-ground-stress tunnel influenced by large-deformation of surrounding rock and save engineering cost on the premise of ensuring structural safety of the high-ground-stress large-deformation tunnel. The pre-anchoring rapid tunneling construction method comprises the following steps that S01, advance drill holes are formed in a tunneling tunnel face, and the advance drill holes are distributed in a diffusion mode at a fixed angle in the tunneling direction within the range of 0-8 m outside a tunneling contour line; S02, pre-stress reinforcing components are installed in the advance drill holes, grouting is conducted, pre-stress is applied to the surrounding rock of an advance core area, and a pre-reinforcing ring surrounding the
Bibliography:Application Number: CN202110150774