BIM-based large prefabricated part hoisting simulation method
A BIM-based large prefabricated part hoisting simulation method is based on BIM software modeling, and comprises the following steps: 1) establishing a three-dimensional site model, a hoisting equipment three-dimensional model and a prefabricated part three-dimensional model in a ratio of 1: 1; 2) s...
Saved in:
Main Authors | , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
19.02.2021
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | A BIM-based large prefabricated part hoisting simulation method is based on BIM software modeling, and comprises the following steps: 1) establishing a three-dimensional site model, a hoisting equipment three-dimensional model and a prefabricated part three-dimensional model in a ratio of 1: 1; 2) selecting a station in the three-dimensional field model, respectively loading the three-dimensionalmodel of the hoisting equipment and the three-dimensional model of the prefabricated part into the station selected by the three-dimensional field model, performing hoisting simulation, observing whether collision occurs or not, if no collision occurs, recording hoisting simulation parameters, and ending the simulation; and 3) if there is a collision, adjusting various hoisting parameters until nocollision occurs, recording hoisting simulation parameters, and ending the simulation. According to the simulation method, the hoisting construction period can be shortened.
一种基于BIM的大型预制构件吊装模拟方法,以BIM软件建模为依据,其步骤如下:1)建立1:1比例的三维 |
---|---|
Bibliography: | Application Number: CN202011268257 |