Fabricated curtain wall overall lifting installation construction method based on BIM model construction technical support

The invention provides a fabricated curtain wall overall lifting installation construction method based on BIM model construction technical support. The method comprises the steps: carrying out the grid division of a vertical surface of a building curtain wall through the Rhino software technology a...

Full description

Saved in:
Bibliographic Details
Main Authors TONG KELONG, FENG GUOSEN, SHI ZONGTAO
Format Patent
LanguageChinese
English
Published 09.02.2021
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention provides a fabricated curtain wall overall lifting installation construction method based on BIM model construction technical support. The method comprises the steps: carrying out the grid division of a vertical surface of a building curtain wall through the Rhino software technology and three-dimensional setting-out; using MATHCAD calculation modeling software for constructing a structural stress analysis model of a whole single-truss assembled curtain wall aluminum plate steel truss; processing and assembling a single assembled curtain wall truss keel in a production place; re-checking the position where the assembled curtain wall is to be installed, and integrally hoisting the single assembled curtain wall after the re-checking is errorless; integrally lifting and mountingthe assembled curtain wall; and then cleaning gaps between the plates, injecting silicone weather-proof sealant, and finally completing construction of the integrally-assembled curtain wall, and delivering the integrally-ass
Bibliography:Application Number: CN202011246549