Well cluster field oil testing and well completion construction processes

The invention relates to the field of well cluster field development in oil and gas field development, and discloses two well cluster field oil testing and well completion construction processes according to different working conditions. The first process is realized based on a set of continuous oil...

Full description

Saved in:
Bibliographic Details
Main Authors YAN JIANBO, TIAN SHENGMIN, XIE TONGCHUAN, ZHANG SHILIN, XU FEI, WU YINGXIN, HUANG QI, LI BO, WANG JIAN, SUN LIBO, YAN BIN, PAN YANPING, LIU YIN, LIU LIN
Format Patent
LanguageChinese
English
Published 22.01.2021
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention relates to the field of well cluster field development in oil and gas field development, and discloses two well cluster field oil testing and well completion construction processes according to different working conditions. The first process is realized based on a set of continuous oil pipe operation machine, two sets of workover rigs and a set of ground flow. The continuous oil pipeoperation machine sequentially completes wellbore preparation operation on all small well groups in the mode that three wells form one group, and the two workover rigs are carried up in sequence andjointly complete perforation completion operation of all the wells. The second process is realized based on a set of continuous oil pipe operation machine, a set of workover rig and a set of ground flow. The continuous oil pipe operation machine performs early-stage operation on each well, and the workover rig performs well completion tubular column descending operation on each well along with theoperation track of the con
Bibliography:Application Number: CN202011229337