Construction method of vertical shaft starting device for top-down pipe-jacking construction in shield tunnel

The invention discloses a construction method of a vertical shaft starting device for top-down pipe-jacking construction in a shield tunnel. According to the method, a pipe jacking machine and a matched trolley are transported to a vertical shaft construction position, an initial position is adjuste...

Full description

Saved in:
Bibliographic Details
Main Authors WANG YAO, ZHANG KEMING, LIANG YU, SHUAI YUBING, LI SEN, YOU DAJIANG, WU HAO, LI JIASHUAI, ZHOU TIANHAO
Format Patent
LanguageChinese
English
Published 15.01.2021
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a construction method of a vertical shaft starting device for top-down pipe-jacking construction in a shield tunnel. According to the method, a pipe jacking machine and a matched trolley are transported to a vertical shaft construction position, an initial position is adjusted, a pipe piece supporting system is adjusted to a working position, a tunnel guide rail at the bottom of equipment is dismounted, a recyclable pipe jacking main machine is made to descend to the contact position capable of directly cutting a composite pipe piece through a crane, a starting steel sleeve is welded, the space between shield tail brushes is filled with grease, and a pipe jacking piece is hoisted to the construction position every time the pipe jacking machine tunnels to a certain position. By means of a matched trolley system and a crane pipe jacking supporting and jacking system, equipment can be integrally conveyed into a main tunnel or conveyed from the main tunnel, mountingand dismounting are conv
Bibliography:Application Number: CN202011461219