Construction method of bracket on pipe joint
The invention discloses a construction method of a bracket on a pipe joint, and relates to the technical field of underwater tunnel construction. The method comprises the following steps that after aleft top plate block body is manufactured, a first left traffic lane top bracket is installed, then t...
Saved in:
Main Authors | , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
15.01.2021
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention discloses a construction method of a bracket on a pipe joint, and relates to the technical field of underwater tunnel construction. The method comprises the following steps that after aleft top plate block body is manufactured, a first left traffic lane top bracket is installed, then the left top plate block body, a left wall block body, a left bottom plate block body and a middle left wall body are sequentially connected to form a left pipe section, a second left traffic lane top bracket and a left traffic lane bottom bracket are installed; after a right top plate block body ismanufactured, a first right traffic lane top bracket is installed, then the right top plate block body, the right wall block body, the right bottom plate block body and the middle right wall body aresequentially connected to form a right pipe section, and a second right traffic lane top bracket and a right traffic lane bottom bracket are installed; and the left pipe section and the right pipe section are folded to form a |
---|---|
Bibliography: | Application Number: CN202011043523 |