Grouting engineering whole process dynamic analysis method based on BIM system
The invention discloses a grouting engineering whole process dynamic analysis method based on a BIM system. The method comprises the following steps: 1) establishing the grouting BIM system; 2.1) performing three-dimensional space intersection operation through the grouting hole model and the geolog...
Saved in:
Main Authors | , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
05.01.2021
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention discloses a grouting engineering whole process dynamic analysis method based on a BIM system. The method comprises the following steps: 1) establishing the grouting BIM system; 2.1) performing three-dimensional space intersection operation through the grouting hole model and the geologic model, and calculating the spatial position of the geologic body penetrated by each grouting hole; 2.2) collecting pilot hole coring and in-hole television geological data on site, and updating the geological model; 2.3) collecting a completed grouting result for statistical analysis, and establishing a unit grouting amount prediction model of the geologic body of the unit; 2.4) utilizing the grouting result of the pilot hole to check and correct the unit mortar injection amount prediction model; 3) quality control: during unit engineering construction, using the BIM system for monitoring grouting parameters in real time and comparing the grouting parameters with predicted values, and 4),after unit engineering c |
---|---|
Bibliography: | Application Number: CN202010916335 |