Construction method for newly excavated channel
The invention discloses a construction method for newly excavating a channel. The construction method comprises the following steps that surface cleaning is conducted; cement mixing pile constructionis conducted; plastic steel sheet pile construction is conducted; a row of first-level well point pip...
Saved in:
Main Authors | , , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
05.01.2021
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention discloses a construction method for newly excavating a channel. The construction method comprises the following steps that surface cleaning is conducted; cement mixing pile constructionis conducted; plastic steel sheet pile construction is conducted; a row of first-level well point pipe dewatering is arranged on each of the two sides of the channel and the center line of the channel; channel earthwork and revetment foundation pit excavation is conducted; excavation is conducted till the bottom elevation of the channel is + 1.6m; two rows of second-level well point pipe dewatering are arranged in the middle of the channel, and first-level well point pipes on the center line of the channel are dismounted; revetment foundation pit and channel earthwork excavation is conducted;channel earthwork excavation is conducted till the elevation is-2.6m; after a wall body of a retaining wall and backfill soil behind the wall body of the retaining wall are +1.6m, water is drained infront of the wall till the |
---|---|
Bibliography: | Application Number: CN202011043134 |