Drainage positioning grouting segment and construction method thereof

The invention discloses a drainage positioning grouting segment and a construction method thereof. The drainage positioning grouting segment comprises a prefabricated segment body and a grouting drainage system, wherein the prefabricated segment body comprises a segment solid body, a prefabricated d...

Full description

Saved in:
Bibliographic Details
Main Authors LI JIONGTAO, WEI GANG, YE JIAHUAN, CUI YUNLIANG, SUN YIFU, ZHANG LISHA, SUN MIAOMIAO
Format Patent
LanguageChinese
English
Published 04.12.2020
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a drainage positioning grouting segment and a construction method thereof. The drainage positioning grouting segment comprises a prefabricated segment body and a grouting drainage system, wherein the prefabricated segment body comprises a segment solid body, a prefabricated drill hole and a preset water pressure pore sensor mounting hole; the grouting drainage system comprises a pre-installed valve, a pre-embedded air bag, a grouting drainage guide pipe and a water pressure pore sensor; and when the water pressure collected by the water pressure pore sensor exceeds a segment stress early warning value, the engineering problems such as segment deformation and crack water seepage can be prevented by opening the valve for drainage or by opening the valve for drainage first and then conducting grouting reinforcement. According to the drainage positioning grouting segment and the construction method thereof, the prefabricated drill hole and the pre-embedded groutingdrainage system are adopt
Bibliography:Application Number: CN202010885373