Bridge foundation protection method
The invention relates to a bridge foundation protection method. The method comprises the following steps: exploring geology of a riverbed surface where a bridge foundation (1) is located, and dividingthe riverbed surface into a bedrock (3) type riverbed surface and a covering layer riverbed surface;...
Saved in:
Main Authors | , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
13.10.2020
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention relates to a bridge foundation protection method. The method comprises the following steps: exploring geology of a riverbed surface where a bridge foundation (1) is located, and dividingthe riverbed surface into a bedrock (3) type riverbed surface and a covering layer riverbed surface; carrying out drilling and grouting on the covering layer riverbed surface, and measuring technicalparameters of grouting holes (2) so as to select a proper grouting method; and arranging steel pipe piles, lead wire gabions and a horizontal water seepage blanket on the covering layer riverbed surface to comprehensively reinforce the riverbed surface, the covering layer and even the bedrock (3) so that a purpose of reinforcing the bridge foundation (1) is achieved, and the bridge foundation (1)is prevented from being damaged by a water flow, rolling stones and the like. Protective reinforcement is performed on the covering layer riverbed surface, and an application range is wide; and largeconstruction equipment is n |
---|---|
Bibliography: | Application Number: CN202010501350 |