Bridge foundation protection method

The invention relates to a bridge foundation protection method. The method comprises the following steps: exploring geology of a riverbed surface where a bridge foundation (1) is located, and dividingthe riverbed surface into a bedrock (3) type riverbed surface and a covering layer riverbed surface;...

Full description

Saved in:
Bibliographic Details
Main Authors HUANG XING, WU TINGPENG, GOU SHICHUAN, ZHONG JIU'AN, YANG ZUOLIANG, LIU XIANGDONG, CHENG JUN
Format Patent
LanguageChinese
English
Published 13.10.2020
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention relates to a bridge foundation protection method. The method comprises the following steps: exploring geology of a riverbed surface where a bridge foundation (1) is located, and dividingthe riverbed surface into a bedrock (3) type riverbed surface and a covering layer riverbed surface; carrying out drilling and grouting on the covering layer riverbed surface, and measuring technicalparameters of grouting holes (2) so as to select a proper grouting method; and arranging steel pipe piles, lead wire gabions and a horizontal water seepage blanket on the covering layer riverbed surface to comprehensively reinforce the riverbed surface, the covering layer and even the bedrock (3) so that a purpose of reinforcing the bridge foundation (1) is achieved, and the bridge foundation (1)is prevented from being damaged by a water flow, rolling stones and the like. Protective reinforcement is performed on the covering layer riverbed surface, and an application range is wide; and largeconstruction equipment is n
Bibliography:Application Number: CN202010501350