Mining method for treating goaf remaining intervening pillar by filling method
The invention discloses a mining method for treating goaf remaining intervening pillars by a filling method. The method comprises the following steps of tunneling an ore removal roadway into an intervening pillar (16) on one side of a middle section transportation roadway (1) to reach an ore body ha...
Saved in:
Main Authors | , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
25.09.2020
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention discloses a mining method for treating goaf remaining intervening pillars by a filling method. The method comprises the following steps of tunneling an ore removal roadway into an intervening pillar (16) on one side of a middle section transportation roadway (1) to reach an ore body hanging wall, and expanding the top of the ore removal roadway by adopting a fan-shaped medium-lengthhole to form a horn-mouth-shaped bottom structure; arranging a cut raise (12) and a pedestrian ventilation raise (3) in a intervening pillar hanging wall ore rock contact face and a footwall surrounding rock respectively, and enabling the cut raise (12) and the pedestrian ventilation raise (3) to communicate with the upper middle section air return roadway, and tunneling layered cross gateways (9)in the pedestrian ventilation raise (3) in the vertical direction at intervals of a certain height to reach the intervening pillar footwall boundary; and drilling upward parallel blast holes (11) layer by layer in circulating |
---|---|
Bibliography: | Application Number: CN202010746866 |