BIM container based foundation pit deformation monitoring system and method

The invention relates to a BIM container based foundation pit deformation monitoring system which comprises a log type message queue connected with a BIM container and a data acquisition system connected with the log type message queue. The data acquisition system is in butt joint with a plurality o...

Full description

Saved in:
Bibliographic Details
Main Authors DU HUI, CAI ZHENYU, XU NING, SHEN WEILONG, CHANG JIANG, RONG GENJUN, WANG KE
Format Patent
LanguageChinese
English
Published 21.08.2020
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention relates to a BIM container based foundation pit deformation monitoring system which comprises a log type message queue connected with a BIM container and a data acquisition system connected with the log type message queue. The data acquisition system is in butt joint with a plurality of fixed inclinometer data acquirers, the fixed inclinometer data acquirers are in corresponding signal connection with high-precision fixed inclinometers, and the high-precision fixed inclinometers are installed in holes in the edge of a foundation pit through installation mechanisms. A BIM container based foundation pit deformation monitoring method includes the steps that the high-precision fixed inclinometers are arranged to send heartbeat and inclination angle data to the fixed inclinometerdata acquirers according to a certain time interval, and the fixed inclinometer data acquirers receive the heartbeat and inclination angle data and send the heartbeat and inclination angle data to thedata acquisition system,
Bibliography:Application Number: CN202010254487