Overhead ground paving method

The invention relates to an overhead ground paving method. The method comprises the following steps of measuring, paying off and positioning the ground of a floor to be paved, placing an adjustable foundation component, judging whether a floor heating requirement exists or not, and paving a main bod...

Full description

Saved in:
Bibliographic Details
Main Authors JIA PENGFEI, YU TIANJIANG, GOU HUAN, PENG MINGQI, AN DELIANG, GUO CHENGWEN, LI JINHUI, QIAN ZEJUN, WU JIANZHEN, WEI ZEYU, LI HONGWEI, JIANG HAIBING, XIONG ZANG
Format Patent
LanguageChinese
English
Published 14.08.2020
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention relates to an overhead ground paving method. The method comprises the following steps of measuring, paying off and positioning the ground of a floor to be paved, placing an adjustable foundation component, judging whether a floor heating requirement exists or not, and paving a main body plate with a hot water pipe groove and a turning die head or paving a main body plate without a hot water pipe groove, adjusting the levelness of the main body plate by adjusting the foundation assembly, fixedly connecting the foundation assembly with the main body plate, installing pressing strips between the main body plate, judging whether hot water pipe grooves exist in the main body plates or not, and paving floor surface layer facing materials. When the method is used for paving the overhead ground, the paving of the floor and the adjustment of the levelness are simple and convenient, the operation is easy, and the whole operation process is dry construction; and materials of the overhead floor can be prefa
Bibliography:Application Number: CN202010380656