MULTI-ENGINE OPTIMIZER ZONE STRATEGY

A power system (100) having a plurality of gensets (102) compares the instantaneous power consumption (504) with a plurality of power consumption (504) zone (404) boundaries and classifies the power consumption (504) into a selected zone (404). Each zone (404) includes a corresponding base power val...

Full description

Saved in:
Bibliographic Details
Main Authors CHASE JAMES, CONVERSE PERRY D, MENGE CHRIS W, SNOPKO MICHAEL A
Format Patent
LanguageChinese
English
Published 19.06.2020
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:A power system (100) having a plurality of gensets (102) compares the instantaneous power consumption (504) with a plurality of power consumption (504) zone (404) boundaries and classifies the power consumption (504) into a selected zone (404). Each zone (404) includes a corresponding base power value and a corresponding dynamic range (306) value, which are apportioned among the plurality of gensets (102). 一种具有多个发电机组(102)的电力系统(100)比较瞬时电力消耗(504)与多个电力消耗(504)区域(404)边界,并将电力消耗(504)分类到选定区域(404)中。每个区域(404)包括在多个发电机组(102)之间分摊的对应基础功率值和对应动态范围(306)值。
Bibliography:Application Number: CN201880071656