Construction method and system of multi-region production simulation power grid

The invention relates to a method and system for constructing a multi-region production simulation power grid. The method comprises the steps that a bottom-layer branch power grid is established firstly, an upper-layer power grid is constructed by introducing a lower-level power grid, and a complex...

Full description

Saved in:
Bibliographic Details
Main Authors ZHAO YUE, HUANG YUEHUI, GAO YUNFENG, GAN ZHIYONG, LIU ZHIBIN, WANG YUEFENG, LIU CHUN, LI PAI, PAN XIAOFENG
Format Patent
LanguageChinese
English
Published 02.06.2020
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention relates to a method and system for constructing a multi-region production simulation power grid. The method comprises the steps that a bottom-layer branch power grid is established firstly, an upper-layer power grid is constructed by introducing a lower-level power grid, and a complex power grid is constructed by continuously aggregating, accumulating and iterating all levels of power grids. The hierarchical construction branch management of the multi-region large-scale power grid is realized, the multi-user collaborative creation of the complex power grid becomes possible, the power grids at all levels are easier to expand and revise, the complexity of constructing the global power grid is greatly reduced, and the workload of creating the multi-region complex power grid is effectively reduced. 本发明涉及一种多区域生产模拟电网的构建方法和系统,包括通过先建立底层分支电网,上层电网的构建通过引入下级电网,利用不断的对各级电网聚合、累加和迭代的方式构建复杂电网。实现多区域大规模电网的分级构建分支管理,使多用户协同创建复杂电网成为可能,也使各级电网更容易扩展和修订,大大降低构建全球电网的复杂性,有效降低创建多区域复杂电网的工作量。
Bibliography:Application Number: CN201911422267