Reservoir scheduling graph drawing method for coupling ensemble forecast information

The invention discloses a reservoir scheduling graph drawing method for coupling ensemble forecast information, and the method comprises the steps: building a runoff forecast error random simulation model based on an in-reservoir runoff forecast sequence, and generating M in-reservoir runoff sets wi...

Full description

Saved in:
Bibliographic Details
Main Authors MING BO, ZHAO ZEQIAN, LI YAN, HUANG QIANG, WANG YIMIN, ZHONG HUAYU, CHEN JING
Format Patent
LanguageChinese
English
Published 05.05.2020
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a reservoir scheduling graph drawing method for coupling ensemble forecast information, and the method comprises the steps: building a runoff forecast error random simulation model based on an in-reservoir runoff forecast sequence, and generating M in-reservoir runoff sets with certain forecast precision; reducing the M in-reservoir runoff scenes into J (M>>J) representative typical scenes by adopting a synchronous back substitution reduction method, and obtaining corresponding occurrence probabilities; describing the scheduling graph by adopting key control parametersbased on the typical in-reservoir runoff situation and the occurrence probability, and establishing a scheduling graph parameter-simulation-optimization model, namely a multi-objective optimization model; and automatically optimizing the key control parameters of the scheduling graph by adopting a multi-objective optimization algorithm to obtain a Pareto solution set, performing scheme optimization on the Pareto solution
Bibliography:Application Number: CN201911347922