Full rock gangway small-section roadway blasting hole arrangement manner and blasting hole construction method
The invention belongs to the technical field of mining excavation, and provides a full rock gangway small-section roadway blasting hole arrangement manner. The full rock gangway small-section roadwayblasting hole arrangement manner includes 14 crushing holes, 10 slotted holes, 15 peripheral holes, 5...
Saved in:
Main Authors | , , , , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
27.03.2020
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention belongs to the technical field of mining excavation, and provides a full rock gangway small-section roadway blasting hole arrangement manner. The full rock gangway small-section roadwayblasting hole arrangement manner includes 14 crushing holes, 10 slotted holes, 15 peripheral holes, 5 bottom holes and 16 auxiliary holes. The 14 crushing holes are arranged in the lower middle portion of the roadway section, are arranged into two rows, are located on the two sides of the center line of a roadway and are staggered; the 10 slotted holes are arranged in the lower middle portion of the roadway section, are arranged into two rows, are located on the two sides of the center line of the roadway and are symmetrically arranged; the distance between the slotted holes and the center line of the roadway is greater than the distance between the crushing holes and the center line of the roadway; the 15 peripheral holes are arranged along the straight wall section and the spring line ofthe roadway section; the |
---|---|
Bibliography: | Application Number: CN201911367005 |