Method for adjusting optimal steam injection speed of heavy oil reservoir steam flooding exploitation
The invention discloses a method for adjusting the optimal steam injection speed of heavy oil reservoir steam flooding exploitation. The method comprises the steps of 1, constructing a scouring multiple distribution model; 2, collecting the basic parameters; 3, calculating the average dryness Xi in...
Saved in:
Main Authors | , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
21.02.2020
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention discloses a method for adjusting the optimal steam injection speed of heavy oil reservoir steam flooding exploitation. The method comprises the steps of 1, constructing a scouring multiple distribution model; 2, collecting the basic parameters; 3, calculating the average dryness Xi in a steam cavity; 4, calculating the optimal average dryness Xo in the steam cavity; and 5, judging whether the current steam injection speed i is the optimal steam injection speed or not, if Xo is equal to Xi, determining that the current steam injection speed i is the optimal steam injection speed,and if Xo is greater than Xi, reducing the current steam injection speed i to Xo = Xi, and if Xo is less than Xi, increasing the current steam injection speed i to Xo = Xi. By adopting the above scheme, the optimal steam injection speed of a steam injection well is reversely deduced and determined by determining the optimal steam cavity average dryness of a heating area, the optimal steam-driven oil production scheme is p |
---|---|
Bibliography: | Application Number: CN201911199882 |