Method for adjusting optimal steam injection speed of heavy oil reservoir steam flooding exploitation

The invention discloses a method for adjusting the optimal steam injection speed of heavy oil reservoir steam flooding exploitation. The method comprises the steps of 1, constructing a scouring multiple distribution model; 2, collecting the basic parameters; 3, calculating the average dryness Xi in...

Full description

Saved in:
Bibliographic Details
Main Authors WANG PENGKUN, LI SAINAN, QIAN YIN, HUANG XIAOLIANG, YAN WENDE, QI ZHILIN, TIAN JIE
Format Patent
LanguageChinese
English
Published 21.02.2020
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a method for adjusting the optimal steam injection speed of heavy oil reservoir steam flooding exploitation. The method comprises the steps of 1, constructing a scouring multiple distribution model; 2, collecting the basic parameters; 3, calculating the average dryness Xi in a steam cavity; 4, calculating the optimal average dryness Xo in the steam cavity; and 5, judging whether the current steam injection speed i is the optimal steam injection speed or not, if Xo is equal to Xi, determining that the current steam injection speed i is the optimal steam injection speed,and if Xo is greater than Xi, reducing the current steam injection speed i to Xo = Xi, and if Xo is less than Xi, increasing the current steam injection speed i to Xo = Xi. By adopting the above scheme, the optimal steam injection speed of a steam injection well is reversely deduced and determined by determining the optimal steam cavity average dryness of a heating area, the optimal steam-driven oil production scheme is p
Bibliography:Application Number: CN201911199882