Construction method for transfer channel needing pipeline underneath-passing
The invention provides a construction method for a transfer channel needing pipeline underneath-passing. The construction method comprises the following methods that the starting end of the transfer channel is excavated through a CRD method to below the end, close to the starting end, of an existing...
Saved in:
Main Authors | , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
31.01.2020
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention provides a construction method for a transfer channel needing pipeline underneath-passing. The construction method comprises the following methods that the starting end of the transfer channel is excavated through a CRD method to below the end, close to the starting end, of an existing pipeline, and a primary support structure is constructed in the excavated transfer channel; the settlement condition of the earth surface and the existing pipeline and the deformation condition of the primary support structure are monitored, and after the settlement of the existing pipeline and theearth surface and the deformation of the primary support structure are stable, excavating is continued to the terminal end of the transfer channel through a CD method. The construction method solvesthe problems that due to the fact that the transfer channel needing multiple pipeline underneath-passing is constructed through adopting a traditional tunnel construction method, multiple pipelines are settled easily, the defo |
---|---|
Bibliography: | Application Number: CN201911071346 |