Steel I-beam cantilever scaffold for sinking well and construction method of steel I-beam cantilever scaffold

The invention relates to the technical field of sinking well construction, and particularly discloses a steel I-beam cantilever scaffold for a sinking well and a construction method of the steel I-beam cantilever scaffold. The steel I-beam cantilever scaffold includes a working well, the working wel...

Full description

Saved in:
Bibliographic Details
Main Authors CHEN ZHEHONG, LIU KELIANG, WU HANGZHOU, DENG YONGCHI, WU CHUNXING
Format Patent
LanguageChinese
English
Published 24.01.2020
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention relates to the technical field of sinking well construction, and particularly discloses a steel I-beam cantilever scaffold for a sinking well and a construction method of the steel I-beam cantilever scaffold. The steel I-beam cantilever scaffold includes a working well, the working well comprises a well wall and a plurality of internal parting walls arranged on the inner side of thewell wall, well wall embedded components, internal parting wall embedded components, and cantilever components are included, the well wall embedded components are used for achieving a detachable connection between the cantilever components and the well wall, and the internal parting wall embedded components are used for realizing the detachable connection between the cantilever components and theinner partition walls. Compared with the prior art, the steel I-beam cantilever scaffold for the sinking well is designed according to the structural characteristics of the working well, and the wellwall embedded components an
Bibliography:Application Number: CN201910938381