Fabricated multi-layer integral mounting method for inner support of steel sheet pile cofferdam of deepwater foundation

The invention discloses a fabricated multi-layer integral mounting method for an inner support of a steel sheet pile cofferdam of a deepwater foundation. The fabricated multi-layer integral inner support is prefabricated on a backfield, an inner support lowering temporary platform, a crossed support...

Full description

Saved in:
Bibliographic Details
Main Authors QIAN YOUWEI, YANG ZHONGYUAN, WANG JIE, LI HONGTAO, WANG YINLONG, HE XIAODONG, LIN HAIFENG, WANG TING, LIU CHANGJIAN, ZHANG XIANGQUN, ZHANG XIANFU, SUN JINGMAO
Format Patent
LanguageChinese
English
Published 10.01.2020
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a fabricated multi-layer integral mounting method for an inner support of a steel sheet pile cofferdam of a deepwater foundation. The fabricated multi-layer integral inner support is prefabricated on a backfield, an inner support lowering temporary platform, a crossed support reinforcing structure and an inner support hanging system are mounted at the top end of a pluralityof bored pile steel pile casings in the cofferdam, and then the fabricated multi-layer integral inner support is hoisted on the inner support lowering temporary platform and lowered to be mounted a designed-elevation position through the inner support hanging system. According to the fabricated multi-layer integral mounting method for the inner support of the steel sheet pile cofferdam of the deepwater foundation, the inner support is prefabricated into the fabricated multi-layer integral inner support and is then lowered to be positioned, so that the field construction efficiency is greatlyimproved, and the field co
Bibliography:Application Number: CN201910936765