Method for improving stability of strip coal pillar

The invention discloses a method for improving stability of a strip coal pillar and relates to the technical field of coal mining. The method comprises the steps that firstly, according to geologicalconditions of a coal bed, the width of a first strip working face haulageway and the width of a way e...

Full description

Saved in:
Bibliographic Details
Main Authors GUO ZHONGPING, HE CHENGQIAN, LENG CHAO, LIU WEIZHEN, ZHANG FUYU
Format Patent
LanguageChinese
English
Published 22.11.2019
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a method for improving stability of a strip coal pillar and relates to the technical field of coal mining. The method comprises the steps that firstly, according to geologicalconditions of a coal bed, the width of a first strip working face haulageway and the width of a way expansion area are designed, then when the haulageway is driven for a certain distance, way expansion reinforcement is conducted along the side of the strip coal pillar. The roof of the way expansion area is supported in metal net laying and anchor rod drilling modes, then anchor rod drilling is conducted in the direction perpendicular to the strip coal pillar to achieve supporting, afterwards a separation wall is built on the other side of the way expansion area, and after separation, gangue paste is poured to the way expansion area. The above steps are repeated alternately till driving of the first strip working face haulageway and reinforcement of the way expansion area are completed, andin the same way, driving
Bibliography:Application Number: CN201910755900