Optimized installation and construction method for channel under anti-electrostatic floor of subway

The invention provides an optimized installation and construction method for a channel under an anti-electrostatic floor of a subway, and belongs to the technical field of installation of pipelines ina machine room of the subway. The method includes the following steps of 1, BIM modeling and collisi...

Full description

Saved in:
Bibliographic Details
Main Authors HAN TIBIN, MIAO JIAJIE, YANG CHEN, ZHANG JIE, XIN DONGHONG, CHEN JINPING, LIANG WEIBING, GUO HONG
Format Patent
LanguageChinese
English
Published 12.11.2019
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention provides an optimized installation and construction method for a channel under an anti-electrostatic floor of a subway, and belongs to the technical field of installation of pipelines ina machine room of the subway. The method includes the following steps of 1, BIM modeling and collision, 2, optimization scheme selection, 3, material counting and processing, 4, on-site setting-out and positioning, 5, construction of the channel and cables, and 6, installation of the anti-electrostatic floor. According to the method, a BIM building model is adopted to simulate a construction environment, the pipeline layout is optimized, and on-site installation is facilitated; the crossing problem of the channel and the anti-electrostatic floor is solved, and the problems are solved that theinstallation of anti-electrostatic floor is not solid and the channel cannot be opened due to the crossing problem. Through a mutual adjustment and selective comparison principle, not only the on-site construction quality and
Bibliography:Application Number: CN201910643633