Flood forecasting method suitable for semi-arid and semi-humid region
The invention discloses a flood forecasting method based on an improved double-super model for a semi-arid and semi-humid region, and the method comprises the steps: carrying out the early-stage processing of DEM data of a research region based on a GIS platform, and obtaining geomorphic feature par...
Saved in:
Main Authors | , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
20.09.2019
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention discloses a flood forecasting method based on an improved double-super model for a semi-arid and semi-humid region, and the method comprises the steps: carrying out the early-stage processing of DEM data of a research region based on a GIS platform, and obtaining geomorphic feature parameters of sub-basins; establishing a sub-basin R-V geomorphic instantaneous unit line (RGIUH) on the basis of the sub-basin R-V geomorphic instantaneous unit line; and then using a geomorphic instantaneous unit line method for replacing a confluence calculation method in the double-super model to construct a double-super-RGIUH model, and using the flood forecasting model for flood forecasting of the semi-arid and semi-humid region after parameter calibration. The invention provides a flood forecasting method for a semi-arid and semi-humid region, which has important significance for improving the flood forecasting precision and researching flood forecasting in a region without data, and provides technical support |
---|---|
Bibliography: | Application Number: CN201910488915 |