Method for determining post-construction ground surface settlement caused by shield tunneling
The invention relates to the technical field of underground construction engineering, and discloses a method for determining post-construction ground surface settlement caused by shield tunneling, which comprises the following steps: acquiring soil layer information, soil parameters, tunnel design p...
Saved in:
Main Authors | , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
23.07.2019
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention relates to the technical field of underground construction engineering, and discloses a method for determining post-construction ground surface settlement caused by shield tunneling, which comprises the following steps: acquiring soil layer information, soil parameters, tunnel design parameters, shield tunneling machine design parameters and shield tunneling parameters; taking soil,forming an e-log p' curve through an indoor consolidation test, and obtaining a q-[gamma]s curve of each soil layer through a non-drainage triaxial compression test; obtaining soil shear strains at different positions after shield tunneling through the three-dimensional numerical model; determining a disturbance degree SDD; determining the apparent self-weight stress, apparent yield stress, rebound index and compression index of each layer of soil body after shield tunneling disturbance based on the disturbance degree SDD to form a disturbed e-log p' curve; and determining the post-construction ground surface settleme |
---|---|
Bibliography: | Application Number: CN201910394388 |