Method for determining post-construction ground surface settlement caused by shield tunneling

The invention relates to the technical field of underground construction engineering, and discloses a method for determining post-construction ground surface settlement caused by shield tunneling, which comprises the following steps: acquiring soil layer information, soil parameters, tunnel design p...

Full description

Saved in:
Bibliographic Details
Main Authors LIU YUAN, MENG FANYAN, WU HUAINA, CHEN SHUAN, YANG WEI, CHEN RENPENG, KANG XIN
Format Patent
LanguageChinese
English
Published 23.07.2019
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention relates to the technical field of underground construction engineering, and discloses a method for determining post-construction ground surface settlement caused by shield tunneling, which comprises the following steps: acquiring soil layer information, soil parameters, tunnel design parameters, shield tunneling machine design parameters and shield tunneling parameters; taking soil,forming an e-log p' curve through an indoor consolidation test, and obtaining a q-[gamma]s curve of each soil layer through a non-drainage triaxial compression test; obtaining soil shear strains at different positions after shield tunneling through the three-dimensional numerical model; determining a disturbance degree SDD; determining the apparent self-weight stress, apparent yield stress, rebound index and compression index of each layer of soil body after shield tunneling disturbance based on the disturbance degree SDD to form a disturbed e-log p' curve; and determining the post-construction ground surface settleme
Bibliography:Application Number: CN201910394388