Hull total section moving construction method
The invention discloses a hull total section moving construction method. The half ship constructing stage comprises the steps: A1, a half ship is divided into a plurality of positioning subsections, all the positioning subsections are distributed at intervals, and all ring sections of all the positi...
Saved in:
Main Authors | , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
19.07.2019
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Abstract | The invention discloses a hull total section moving construction method. The half ship constructing stage comprises the steps: A1, a half ship is divided into a plurality of positioning subsections, all the positioning subsections are distributed at intervals, and all ring sections of all the positioning subsections are parallelly connected into a whole; and A2, all the positioning subsections aremoved, and the constructed half ship is obtained. The whole ship constructing stage comprises the steps: B1, a remaining half ship is divided into a plurality of positioning subsections, each positioning subsection comprises two or more ring sections, all the positioning subsections and the constructed half ship are distributed in a spaced mode, and all the ring sections of all the positioning subsections are parallelly connected into a whole; and B2, all the positioning subsections are moved, and a constructed whole ship is obtained. Through application of the hull total section moving construction method, during co |
---|---|
AbstractList | The invention discloses a hull total section moving construction method. The half ship constructing stage comprises the steps: A1, a half ship is divided into a plurality of positioning subsections, all the positioning subsections are distributed at intervals, and all ring sections of all the positioning subsections are parallelly connected into a whole; and A2, all the positioning subsections aremoved, and the constructed half ship is obtained. The whole ship constructing stage comprises the steps: B1, a remaining half ship is divided into a plurality of positioning subsections, each positioning subsection comprises two or more ring sections, all the positioning subsections and the constructed half ship are distributed in a spaced mode, and all the ring sections of all the positioning subsections are parallelly connected into a whole; and B2, all the positioning subsections are moved, and a constructed whole ship is obtained. Through application of the hull total section moving construction method, during co |
Author | XU RENTANG XIA CHANGWEI LI ZHUANG XI BAOCHENG ZHANG WEIZHONG FAN DONGHUI FAN JINGJING |
Author_xml | – fullname: ZHANG WEIZHONG – fullname: XI BAOCHENG – fullname: FAN JINGJING – fullname: XIA CHANGWEI – fullname: XU RENTANG – fullname: FAN DONGHUI – fullname: LI ZHUANG |
BookMark | eNrjYmDJy89L5WTQ9SjNyVEoyS9JzFEoTk0uyczPU8jNL8vMS1dIzs8rLikqhYqllmTkp_AwsKYl5hSn8kJpbgZFN9cQZw_d1IL8-NTigsTk1LzUknhnP0NDAwMjczNzE0djYtQAAOUqLFQ |
ContentType | Patent |
DBID | EVB |
DatabaseName | esp@cenet |
DatabaseTitleList | |
Database_xml | – sequence: 1 dbid: EVB name: esp@cenet url: http://worldwide.espacenet.com/singleLineSearch?locale=en_EP sourceTypes: Open Access Repository |
DeliveryMethod | fulltext_linktorsrc |
Discipline | Medicine Chemistry Sciences |
DocumentTitleAlternate | 船体总段移位建造法 |
ExternalDocumentID | CN110027674A |
GroupedDBID | EVB |
ID | FETCH-epo_espacenet_CN110027674A3 |
IEDL.DBID | EVB |
IngestDate | Fri Jul 19 14:56:44 EDT 2024 |
IsOpenAccess | true |
IsPeerReviewed | false |
IsScholarly | false |
Language | Chinese English |
LinkModel | DirectLink |
MergedId | FETCHMERGED-epo_espacenet_CN110027674A3 |
Notes | Application Number: CN201910407040 |
OpenAccessLink | https://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20190719&DB=EPODOC&CC=CN&NR=110027674A |
ParticipantIDs | epo_espacenet_CN110027674A |
PublicationCentury | 2000 |
PublicationDate | 20190719 |
PublicationDateYYYYMMDD | 2019-07-19 |
PublicationDate_xml | – month: 07 year: 2019 text: 20190719 day: 19 |
PublicationDecade | 2010 |
PublicationYear | 2019 |
RelatedCompanies | SHANGHAI WAIGAOQIAO SHIPBUILDING CO., LTD |
RelatedCompanies_xml | – name: SHANGHAI WAIGAOQIAO SHIPBUILDING CO., LTD |
Score | 3.338134 |
Snippet | The invention discloses a hull total section moving construction method. The half ship constructing stage comprises the steps: A1, a half ship is divided into... |
SourceID | epo |
SourceType | Open Access Repository |
SubjectTerms | EQUIPMENT FOR SHIPPING PERFORMING OPERATIONS RELATED EQUIPMENT SHIPS OR OTHER WATERBORNE VESSELS TRANSPORTING |
Title | Hull total section moving construction method |
URI | https://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20190719&DB=EPODOC&locale=&CC=CN&NR=110027674A |
hasFullText | 1 |
inHoldings | 1 |
isFullTextHit | |
isPrint | |
link | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwfV1bS8MwFD7MKeqbTkXnhQjSt6BL1ttDEZe2FGHdkCl7G23aMgXXQQuCv96T2Flf9C0XOLnAl3NJ8h2AmwFL7MwxLcozzugwlZwmTObUdTJp51bOmebZHsdW9Dx8nJvzDrxt_sJontAPTY6IiJKI91qf1-s2iOXrt5XVbfqKTeV9OPN8o_GOUbvZiEB_5AXTiT8RhhCeiI34yVPMaEwR1zxswTaa0bZCQ_AyUr9S1r9VSngAO1OUtqoPofO57MGe2GRe68HuuLnwxmKDveoIaITeIqlLtJZJpR9Qrci7jgcQWbY8sOQ7J_QxXIfBTEQUx138LHIh4naK_AS66Pznp0BcJ80S0-ZOIdEVKgpH8jsm0dZEpHKsnEH_bzn9_zrPYV9tmIpTDtwL6OI080tUsHV6pXfmCw-If0E |
link.rule.ids | 230,309,783,888,25576,76882 |
linkProvider | European Patent Office |
linkToHtml | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwfV1LT4NAEJ7Uaqw3rZpaX5gYbkTLFlgOxNgFglpoY9D0RmCBqImlCSQm_nqHlYoXve0j2Vfy7Tx25xuAy5EaGynVdIWkRFXGCSdKrPJMMWnKjUzPiCp4tv1A957G9wtt0YG3dSyM4An9EOSIiCiOeK_Efb1qnVi2-FtZXiWv2FTcuKFly411jNLNQATaE8uZz-wZkxmzWCAHj1bNjKbWxDW3G7CJKjatsx04z5M6KmX1W6S4u7A1x9GW1R50Pl_60GPrzGt92PabB28sNtgr90Hx0FqUqgK1ZakUH6iW0rvwB0i8aHlgpe-c0Adw4Toh8xScN_rZZMSCdonkELpo_GcDkEyapLFmEJpzNIXynHJyrXLUNRGpBCtHMPx7nOF_nefQ80J_Gk3vgodj2KkPr_ZZjswT6OKSs1MUtlVyJk7pCy5EgjE |
openUrl | ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Apatent&rft.title=Hull+total+section+moving+construction+method&rft.inventor=ZHANG+WEIZHONG&rft.inventor=XI+BAOCHENG&rft.inventor=FAN+JINGJING&rft.inventor=XIA+CHANGWEI&rft.inventor=XU+RENTANG&rft.inventor=FAN+DONGHUI&rft.inventor=LI+ZHUANG&rft.date=2019-07-19&rft.externalDBID=A&rft.externalDocID=CN110027674A |