Hull total section moving construction method

The invention discloses a hull total section moving construction method. The half ship constructing stage comprises the steps: A1, a half ship is divided into a plurality of positioning subsections, all the positioning subsections are distributed at intervals, and all ring sections of all the positi...

Full description

Saved in:
Bibliographic Details
Main Authors ZHANG WEIZHONG, XI BAOCHENG, FAN JINGJING, XIA CHANGWEI, XU RENTANG, FAN DONGHUI, LI ZHUANG
Format Patent
LanguageChinese
English
Published 19.07.2019
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a hull total section moving construction method. The half ship constructing stage comprises the steps: A1, a half ship is divided into a plurality of positioning subsections, all the positioning subsections are distributed at intervals, and all ring sections of all the positioning subsections are parallelly connected into a whole; and A2, all the positioning subsections aremoved, and the constructed half ship is obtained. The whole ship constructing stage comprises the steps: B1, a remaining half ship is divided into a plurality of positioning subsections, each positioning subsection comprises two or more ring sections, all the positioning subsections and the constructed half ship are distributed in a spaced mode, and all the ring sections of all the positioning subsections are parallelly connected into a whole; and B2, all the positioning subsections are moved, and a constructed whole ship is obtained. Through application of the hull total section moving construction method, during co
Bibliography:Application Number: CN201910407040