Hull total section moving construction method
The invention discloses a hull total section moving construction method. The half ship constructing stage comprises the steps: A1, a half ship is divided into a plurality of positioning subsections, all the positioning subsections are distributed at intervals, and all ring sections of all the positi...
Saved in:
Main Authors | , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
19.07.2019
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention discloses a hull total section moving construction method. The half ship constructing stage comprises the steps: A1, a half ship is divided into a plurality of positioning subsections, all the positioning subsections are distributed at intervals, and all ring sections of all the positioning subsections are parallelly connected into a whole; and A2, all the positioning subsections aremoved, and the constructed half ship is obtained. The whole ship constructing stage comprises the steps: B1, a remaining half ship is divided into a plurality of positioning subsections, each positioning subsection comprises two or more ring sections, all the positioning subsections and the constructed half ship are distributed in a spaced mode, and all the ring sections of all the positioning subsections are parallelly connected into a whole; and B2, all the positioning subsections are moved, and a constructed whole ship is obtained. Through application of the hull total section moving construction method, during co |
---|---|
Bibliography: | Application Number: CN201910407040 |