RTK field synchronous drawing sketching method
The invention discloses an RTK field synchronous drawing sketching method. After measurement of each point, connection drawing is performed according to a measuring sequence, and little manual intervention is performed when necessary. After measurement, drawing can be fundamentally finished, thereby...
Saved in:
Main Authors | , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
29.03.2019
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention discloses an RTK field synchronous drawing sketching method. After measurement of each point, connection drawing is performed according to a measuring sequence, and little manual intervention is performed when necessary. After measurement, drawing can be fundamentally finished, thereby omitting a step of manual sketching a drawing, reducing manpower and physical resource which are required in measurement, realizing loading of a measured area image, facilitating point selection in measurement and finished drawing correction and use in a later period, realizing real-time data sharing of multiple RTKs, facilitating understanding of an integral working process and improving working efficiency.
本发明公开了种RTK外业同步绘制草图方法,在每个点位测量完成后根据测量顺序连接绘图,必要时进行少量人工干预,在测量完成后即可基本绘图完成,省略人工绘制草图这环节,减轻测量工作所需的人力、物力,还可以加载测区实地影像,方便测量时选点以及后期对成图的修正及使用,多台RTK实时数据共享,便于了解整体工作进度,提高工作效率。 |
---|---|
Bibliography: | Application Number: CN201811366937 |