RTK field synchronous drawing sketching method

The invention discloses an RTK field synchronous drawing sketching method. After measurement of each point, connection drawing is performed according to a measuring sequence, and little manual intervention is performed when necessary. After measurement, drawing can be fundamentally finished, thereby...

Full description

Saved in:
Bibliographic Details
Main Authors LI ZHENG, RUAN QINGSHAN, LIU LIXIA, MA YONGCHAO, CHEN PENG, ZHENG NAIQUAN, LIU HANG
Format Patent
LanguageChinese
English
Published 29.03.2019
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses an RTK field synchronous drawing sketching method. After measurement of each point, connection drawing is performed according to a measuring sequence, and little manual intervention is performed when necessary. After measurement, drawing can be fundamentally finished, thereby omitting a step of manual sketching a drawing, reducing manpower and physical resource which are required in measurement, realizing loading of a measured area image, facilitating point selection in measurement and finished drawing correction and use in a later period, realizing real-time data sharing of multiple RTKs, facilitating understanding of an integral working process and improving working efficiency. 本发明公开了种RTK外业同步绘制草图方法,在每个点位测量完成后根据测量顺序连接绘图,必要时进行少量人工干预,在测量完成后即可基本绘图完成,省略人工绘制草图这环节,减轻测量工作所需的人力、物力,还可以加载测区实地影像,方便测量时选点以及后期对成图的修正及使用,多台RTK实时数据共享,便于了解整体工作进度,提高工作效率。
Bibliography:Application Number: CN201811366937