Rapid construction method of tunnel grade separation
The invention provides a rapid construction method of tunnel grade separation, and belongs to the field of coal mine tunnel construction. The rapid construction method comprises the following steps that a) a lower tunnel is dug; b) before that the lower tunnel is dug to a position of an upper tunnel...
Saved in:
Main Authors | , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
15.01.2019
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention provides a rapid construction method of tunnel grade separation, and belongs to the field of coal mine tunnel construction. The rapid construction method comprises the following steps that a) a lower tunnel is dug; b) before that the lower tunnel is dug to a position of an upper tunnel, the bottom of the upper tunnel is grooved in advance, and a groove is formed; c) the groove is laid with I-beam steel and precast with concrete; d) after solidification of the concrete, a channel is dug in the lower tunnel by taking the concrete as a top plate; and e) anchor poles are anchored into the two sides of the lower tunnel. Via the rapid construction method of the tunnel grade separation, steps of grooving and concrete spraying in the two sides of the lower tunnel can be omitted, theconstruction period is shortened greatly without influence on a ventilation system, construction is simple and convenient, the cost is low, and the method is reasonable in design and high in practicality.
本发明提供了种巷道立交快速施工法,属于煤 |
---|---|
Bibliography: | Application Number: CN201811067400 |