110 kV cable connector operation overvoltage characteristic estimation method

The invention discloses a 110 kV cable connector operation overvoltage characteristic estimation method comprising the following steps: 110kV three-phase cables are completely symmetrical in case of normal closing and three-phase circuit breakers are fully synchronized, the equivalent circuit is obt...

Full description

Saved in:
Bibliographic Details
Main Authors PU LU, ZHANG GUANJUN, ZHAO XUEFENG, ZHENG JIANKANG, WANG YONGFENG, FENG NANZHAN, JING XIAODONG, NI NA, SU XIAOTING, ZHAO AIXUAN, DENG JUNBO, LIN TAO
Format Patent
LanguageChinese
English
Published 04.01.2019
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a 110 kV cable connector operation overvoltage characteristic estimation method comprising the following steps: 110kV three-phase cables are completely symmetrical in case of normal closing and three-phase circuit breakers are fully synchronized, the equivalent circuit is obtained when the no-load line is switched on, the effect of power supply and circuit resistance is omitted, the no-load line is replaced by the T-shaped equivalent circuit, LT and CT are the equivalent inductance and capacitance of the line, the power supply potential is Emcosomegat, and then the equivalent circuit can be simplified as a single oscillation loop; when t=0, the no-load long line with zero initial voltage is connected with the AC power supply e (t) = Em(cosomegat + theta), the head voltage U1 (S) of the line after closing and the end voltage U2 (S) of the line after closing are obtained by using Laplace transformation, and the operation overvoltage u2 (t) at the end of the 110 kVcable after closing is o
Bibliography:Application Number: CN201811095743