Framed bent-free high slope treatment method
The invention relates to a framed bent-free high slope treatment method, which comprises the following steps: 1) the upper part of a slope is layered in sections and excavated by a backhoe excavator;2) in the excavation process of the backhoe excavator in a construction section, a first hydraulic dr...
Saved in:
Main Authors | , , , , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
06.04.2018
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention relates to a framed bent-free high slope treatment method, which comprises the following steps: 1) the upper part of a slope is layered in sections and excavated by a backhoe excavator;2) in the excavation process of the backhoe excavator in a construction section, a first hydraulic drill rig is used to construct in a construction finishing section and to perform blasting drilling in a pre-splitting finishing section at the lower layer of the construction finishing section at the same time; 3) in the slope excavation process of the backhoe excavator in the construction section,a second hydraulic drill rig is used to drill drainage holes on the excavated slope of the construction section; and 4) the first hydraulic drill rig is transferred to the construction section for supporting hole drilling after completion of blasting drilling in the pre-splitting finishing section. The above structure can greatly improve the slope support operation, and can realize the setting ofsupport anchor bolts withou |
---|---|
Bibliography: | Application Number: CN201711005822 |