Application function linkage rule verification method and system for intelligent substation

The invention relates to an application function linkage rule verification method and a system for an intelligent substation. An advanced application function testing system enables the sequence control module of a to-be-tested advanced function application system to send the sequence control inform...

Full description

Saved in:
Bibliographic Details
Main Authors ZHANG JINHU, LI YALEI, LI WENZHUO, WANG HUAPENG, JIE JINXING, WANG ZHIHUA, WU KUN, JIANG JIANING, LI JINGSONG, YU DAFEI, YANG WENPING, LIU XIAOPING, YANG WEI, LIU HAIYANG
Format Patent
LanguageChinese
English
Published 19.01.2018
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention relates to an application function linkage rule verification method and a system for an intelligent substation. An advanced application function testing system enables the sequence control module of a to-be-tested advanced function application system to send the sequence control information to a process layer and an interval layer simulation IED of the intelligent substation. The advanced application function testing system acquires the sequence control feedback information from the process layer and the interval layer simulation IED of the intelligent substation. The advanced application function testing system enables an intelligent alarm module of the to-be-tested advanced function application system to send the alarm information according to the sequence control feedbackinformation, compares the alarm information with the alarm information of the same type pre-stored in an advanced application function case verification database, and verifies the linkage accuracy ofthe alarm information. Acc
Bibliography:Application Number: CN201710905369