Biomass high-temperature high-pressure circulating fluidized bed boiler complete set installing method

The invention discloses a biomass high-temperature high-pressure circulating fluidized bed boiler complete set installing method. The biomass high-temperature high-pressure circulating fluidized bed boiler complete set installing method comprises the following steps that before equipment assemblies...

Full description

Saved in:
Bibliographic Details
Main Authors TAN JIANDONG, YU HAIBO, LIU HUZI, LUO DEPENG, YAO GUODONG
Format Patent
LanguageChinese
English
Published 26.12.2017
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a biomass high-temperature high-pressure circulating fluidized bed boiler complete set installing method. The biomass high-temperature high-pressure circulating fluidized bed boiler complete set installing method comprises the following steps that before equipment assemblies such as a boiler drum and a water cooled wall are hoisted, a boiler body frame is built firstly and comprises a stand column steel frame, a transverse beam and a top plate beam; scales are marked on the inner sides of the steel frame and the transverse beam, and the bottom surface of the top plate beam is provided with grid lines; the inner side of the transverse beam is further provided with an infrared laser transmitter, and a winding engine is installed on the top plate beam; the frame is internally provided with a sliding rail, a sliding vehicle set and a chain fall, wherein the sliding vehicle set and the chain fall are matched with the sliding rail, and multiple hook changing is conducted by using the sliding
Bibliography:Application Number: CN201710686744