Method of determining fault number of rail vehicles in reliability growth period according to confidence

The invention relates to a method of determining a fault number of rail vehicles in a reliability growth period according to confidence. According to the method, running mileage or time of a project rail vehicle is combined to calculate an expected fault number of the reliability growth period accor...

Full description

Saved in:
Bibliographic Details
Main Authors XUE SHUSHENG, WAN HONGWEI, ZHU AIFENG, ZHOU AIPING, SHENG YINSHENG, ZHANG HENG, ZHANG LIN
Format Patent
LanguageChinese
English
Published 22.12.2017
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention relates to a method of determining a fault number of rail vehicles in a reliability growth period according to confidence. According to the method, running mileage or time of a project rail vehicle is combined to calculate an expected fault number of the reliability growth period according to reliability index requirements which are specified by a project rail vehicle specification and of a start point and an end point of the reliability growth period, and the allowed project fault number of the reliability growth period is determined according to the confidence to serve as a basis of verifying reliability meeting. By adopting the method, impacts due to rail vehicle batch and number differences of the reliability growth period in gradual delivering of the same-project rail vehicles can also be quantitatively calculated. Traditional methods do not consider randomness of fault occurrence and the impacts of the sample number difference of the rail vehicle number on the allowed reliability fault num
Bibliography:Application Number: CN201710628609