Construction method for sealing limestone cave groove wall in underground continuous wall construction

The invention provides a construction method for sealing a limestone cave groove wall in underground continuous wall construction. The construction method comprises steps: (1) investigating cave conditions; (2) punching grouting holes: punching single-liquid grouting holes at both sides of the conti...

Full description

Saved in:
Bibliographic Details
Main Authors WANG YINJIE, ZHANG RUNDE, XIE BAORU, LIANG HELONG, TANG WUXING, XIAO MINQUAN, XIE ZHIJIE, HUANG MAOXING, LUO HAITENG, CAI KAIXIANG
Format Patent
LanguageChinese
English
Published 03.10.2017
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention provides a construction method for sealing a limestone cave groove wall in underground continuous wall construction. The construction method comprises steps: (1) investigating cave conditions; (2) punching grouting holes: punching single-liquid grouting holes at both sides of the continuous wall position alternately; punching double-liquid grouting holes at the outer sides of the single-liquid grouting holes alternately; (3) injecting double-liquid grout into the cave through the double-liquid grouting holes: the double-liquid grout is the mixed grout of cement, water and soluble silicate, and a continuous curtain wall area is formed by enclosure in the cave; (4) injecting single-liquid grout into the cave through the double-liquid and single-liquid grouting holes, the single-liquid grout is cement grout, and a continuous wall diggable area is formed in the continuous wall area; and (5) detecting the grouting effect. According to the construction method provided by the invention, for deep caves,
Bibliography:Application Number: CN201710602537