Construction method for sealing limestone cave groove wall in underground continuous wall construction
The invention provides a construction method for sealing a limestone cave groove wall in underground continuous wall construction. The construction method comprises steps: (1) investigating cave conditions; (2) punching grouting holes: punching single-liquid grouting holes at both sides of the conti...
Saved in:
Main Authors | , , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
03.10.2017
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention provides a construction method for sealing a limestone cave groove wall in underground continuous wall construction. The construction method comprises steps: (1) investigating cave conditions; (2) punching grouting holes: punching single-liquid grouting holes at both sides of the continuous wall position alternately; punching double-liquid grouting holes at the outer sides of the single-liquid grouting holes alternately; (3) injecting double-liquid grout into the cave through the double-liquid grouting holes: the double-liquid grout is the mixed grout of cement, water and soluble silicate, and a continuous curtain wall area is formed by enclosure in the cave; (4) injecting single-liquid grout into the cave through the double-liquid and single-liquid grouting holes, the single-liquid grout is cement grout, and a continuous wall diggable area is formed in the continuous wall area; and (5) detecting the grouting effect. According to the construction method provided by the invention, for deep caves, |
---|---|
Bibliography: | Application Number: CN201710602537 |