Bailey arch butt joint and shut construction method

The invention discloses a bailey arch butt joint and shut construction method, and the method comprises the steps of assembling a bailey rack with a single-row single-layer bailey sheet and a transversal connection bracing frame at an ashore abutment by a worker, and installing an arch shut butt joi...

Full description

Saved in:
Bibliographic Details
Main Authors PENG RONGXIN, ZHOU JING, YAO JIASHUAI, NIU DONG, HE WENBAI, CHEN AIJUN
Format Patent
LanguageChinese
English
Published 18.08.2017
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a bailey arch butt joint and shut construction method, and the method comprises the steps of assembling a bailey rack with a single-row single-layer bailey sheet and a transversal connection bracing frame at an ashore abutment by a worker, and installing an arch shut butt joint apparatus at a bailey rack female connector; hoisting the bailey rack assembled in step 1 to an assigned construction place to butt joint a suspending arch in the air through two hoisting points of the bailey rack cable hoisting system; after assembling the arch, drawing vertically 2-4 channel segment buckle cables to an I-steel crossbeam at the bottom of the arch, and drawing transversally 2 channels for stabilizing a segment wind cable of the arch on the I-steel crossbeam to complete a whole segment of bailey rack. Repeat the steps above until the top of the arch so as to complete the whole arch erection. According to index like the construction place and the cable hoisting system for on-site bailey arch assem
Bibliography:Application Number: CN20171246337