Foundation pit curtain construction method in gravel layer

The invention discloses a foundation pit curtain construction method in a gravel layer, and aims to provide a construction method capable of quickening the construction period and with good waterproof effect of a foundation pit curtain and high capacity of resisting active soil pressure outside a pi...

Full description

Saved in:
Bibliographic Details
Main Authors HU QI, DOU DONGDONG, WEN NIANGHOU, HU HUAN, ZHANG ZHICHUN
Format Patent
LanguageChinese
English
Published 19.04.2017
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a foundation pit curtain construction method in a gravel layer, and aims to provide a construction method capable of quickening the construction period and with good waterproof effect of a foundation pit curtain and high capacity of resisting active soil pressure outside a pit. The foundation pit curtain includes a foundation pit bracing body and a waterproof curtain. The foundation pit bracing body includes multiple bracing piles arranged in sequence. The construction method of single bracing pile comprises the following steps in sequence: (A) construction of a bracing pile hole: a rotary drilling machine is adopted to excavate foundation soil above the bottom elevation of the foundation pit curtain to form the bracing pile hole; (B) boulders in the foundation soil excavated from the bracing pile hole are removed; and then, the foundation soil is filled back into the bracing pile hole; and (C) H-shaped steel is inserted in the bracing pile hole to support the foundation pit. 本发明公开了种碎石
Bibliography:Application Number: CN20161939112