Cable-stayed bridge side span beam section erecting system and method thereof

The invention provides a cable-stayed bridge side span beam section erecting system which comprises a side span support, a gliding traction system and a pushing closure system, wherein the side span support is erected between side span area bridge piers, and comprises a lower stressed structure and...

Full description

Saved in:
Bibliographic Details
Main Authors GAO SHIQIANG, ZHAO SHENGHUI, WU HANWEN, WEI CHAO, GE JIPING, TAN XINGHUA, LIU HUAIGANG, ZHANG ZHENG, LIANG ZHEN, XIA JIANGNAN, XIAO XIANGRONG, LIAO SHUNSHAN, SHI EN, FEI YONGZHONG
Format Patent
LanguageChinese
English
Published 22.03.2017
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention provides a cable-stayed bridge side span beam section erecting system which comprises a side span support, a gliding traction system and a pushing closure system, wherein the side span support is erected between side span area bridge piers, and comprises a lower stressed structure and an upper stressed structure, the lower stressed structure comprises a plurality of steel tube stand columns arranged in the bridge longitudinal direction and support structures between the stand columns, and the upper stressed structure comprises a beam section gliding foundation and a beam section frame removing foundation; and the gliding traction system is arranged on the upper stressed structure, and comprises a gliding device used for gliding of a bearing beam section and a traction device used for providing traction force for gliding of the beam section; and the pushing closure system comprises a gliding support pier device distributed on the side span area bridge piers and the side span area support, and a p
Bibliography:Application Number: CN201611264015