Cover

More Information
Summary:The invention provides a method for preventing and controlling water inrush channels generated by faults of coal mining floors. The method includes the steps that (1) a floor rock layer near a stope face is detected; (2) a drilled hole a is drilled in the stope face advanced gate roadway floor, and a casing A is installed; (3) a drilled hole b is drilled in the stope face advanced gate roadway floor, and a casing B is installed; (4) the casing A is used for draining water, and the casing B is used for grouting for blocking water; (5) while water is drained and grouting is conducted for blocking water, the water pressure change in the drainage position of the casing A is monitored, and grouting in the casing B is stopped in due time; (6) the casing A is connected to a grouting pump, and grouting and water-blocking materials are injected at high pressure; (7) grouting in the casing A is stopped when grout reversing in the casing A is stable; (8) a drilled hole c, a drilled hole d, a drilled hole e and a drilled
Bibliography:Application Number: CN20161330340