Air vent with diversion tunnel reconstructed into arc-shaped gate control and arrangement method
The invention discloses an air vent with a diversion tunnel reconstructed into arc-shaped gate control and an arrangement method. The air vent comprises a water inlet tower (1) which is arranged at the upstream of a to-be-modified diversion tunnel (2), wherein an air vent (1.1) is pre-arranged in th...
Saved in:
Main Authors | , , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
23.03.2016
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention discloses an air vent with a diversion tunnel reconstructed into arc-shaped gate control and an arrangement method. The air vent comprises a water inlet tower (1) which is arranged at the upstream of a to-be-modified diversion tunnel (2), wherein an air vent (1.1) is pre-arranged in the water inlet tower (1); an inlet gradual-changing section (3) is arranged between the water inlet tower (1) and the to-be-modified diversion tunnel (2); an ecological dewatering tunnel section (2.2) is sequentially divided into a section M and a section N, wherein the section M is a concrete reconstructed body A (4) which is formed by pouring concrete to the ecological dewatering tunnel section (2.2); and a water release channel (2.2.1) is reserved in the bottom of the concrete reconstructed body A (4). The air vent overcomes the defect that a gate and other drainage facilities are damaged by a negative pressure region behind the gate as air is taken away by outflow sluice during full-flow aerial drainage, and has |
---|---|
Bibliography: | Application Number: CN201510960777 |