Offshore wind resource assessment method based on Monte Carlo operation and maintenance simulation model

The invention provides an offshore wind resource assessment method based on a Monte Carlo operation and maintenance simulation model. The method comprises the following steps that research-stage data of an offshore wind power farm is obtained; vertical change rule and day and night change rule of th...

Full description

Saved in:
Bibliographic Details
Main Authors HE YAN, HUANG BIQING, FENG XIAODAN, SANG QI, ZHU QIHAO, GUO CHEN, FENG YU
Format Patent
LanguageEnglish
Published 03.02.2016
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention provides an offshore wind resource assessment method based on a Monte Carlo operation and maintenance simulation model. The method comprises the following steps that research-stage data of an offshore wind power farm is obtained; vertical change rule and day and night change rule of the wind speed are researched; a stormy wave coupling empirical formula of the lowest square error is selected; the annual average fault rate of an aerogenerator to be used is calculated; the time limit of simulation operation, the distance between an operation center and the wind farm and the candidate parameter of approach technology are input; algorithm parameters are initialized; the wind speed, effective wave height and fault random number that satisfy distribution characteristic of each time are generated; generated faults are arranged in a fault preparation queue; preparation time for fault processing is generated, and faults prepared to be completed are arranged in a fault maintenance queue; the time window of the current data is calculated, the feasibility and validity of offshore maintenance are determined, and faults in an optimal scheme are placed in an offshore queue; generating capacity loss in the offshore queue is calculated and stored, and the faults are removed from the offshore queue; the networking electric quantity of the operation aerogenerator in the current data is calculated, and increment is implemented in the current date; and when the current data equals an operation year, the networking electric quality and the total loss of electric quantity are calculated.
Bibliography:Application Number: CN20151680051