Floor mining damage zone multi-section blocking synchronous leakage detection method
The invention discloses a floor mining damage zone multi-section blocking synchronous leakage detection method, which comprises the following steps of: forming a downward drill hole in a roof rock layer from a coal rock roadway, and cleaning the drill hole; installing a detection system, wherein a t...
Saved in:
Main Authors | , , , , , , , , , , , |
---|---|
Format | Patent |
Language | English |
Published |
28.10.2015
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention discloses a floor mining damage zone multi-section blocking synchronous leakage detection method, which comprises the following steps of: forming a downward drill hole in a roof rock layer from a coal rock roadway, and cleaning the drill hole; installing a detection system, wherein a test probe of the detection system is formed by sequentially connecting a plurality of detection units, and the adjacent detection units are detachably connected through clamp groove joints; conveying the detection system to the initial position of the drill hole by using a drill pipe and a drilling machine in a supply measuring system; using a blocking system to seal the drill hole; using a water injection operation platform to convey a water source at the specific pressure to a water inlet pipe; processing and analyzing the collected data, then, forming a corresponding flow water vector diagram of the test section, and the like. The method provided by the invention has the advantages that the multi-section and synchronous measurement of a floor mining damage zone can be realized; the test section number in one test can be properly increased according to the length of the drill hole; the workload is exponentially reduced; and the measurement precision is improved. |
---|---|
Bibliography: | Application Number: CN20151354666 |