Acceptable replenishing contact with failure isolation function

The invention provides an acceptable replenishing contact with a failure isolation function. The replenishing contact comprises an outer shell and a contact structure, wherein the contact structure is mounted on a receiver through the outer shell, and the contact structure is arranged in the outer s...

Full description

Saved in:
Bibliographic Details
Main Authors KANG ZHIYU, LEI YATONG, ZENG ZHANKUI, TANG SHUREN, TANG PING, JIN YONGQIANG
Format Patent
LanguageEnglish
Published 09.09.2015
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention provides an acceptable replenishing contact with a failure isolation function. The replenishing contact comprises an outer shell and a contact structure, wherein the contact structure is mounted on a receiver through the outer shell, and the contact structure is arranged in the outer shell and can axially move along the inner side of the outer shell; limiting sliding blocks are arranged in the inside wall of the outer shell, and the limiting sliding blocks radially slide and extend outside the inner surface of the outer shell along the contact structure; sliding push rods are arranged on the end surface, which is opposite to gas-liquid floating disconnectors, of the outer shell, one end of each sliding push rod extends outside the end surface of the outer shell, the other end of each sliding push rod is abutted to the limiting sliding block, and the contact surfaces of the limiting sliding blocks and the sliding push rods are bevels; a limiting structure is arranged on one circle of the outer surface of the contact structure. The replenishing contact disclosed by the invention can smoothly complete the pipeline docking operation of multiple groups of gas-liquid floating disconnectors, and under the condition that a certain group of the gas-liquid floating disconnector is jammed, the docking of other gas-liquid floating disconnectors and corresponding pipelines is not influenced, and the subsequent high pressure gas-liquid replenishing operation, normal disconnection operation and the like are not influenced.
Bibliography:Application Number: CN20151241547