Rapid subway construction risk evaluation method based on Dasarathy model

The invention discloses a rapid subway construction risk evaluation method based on a Dasarathy model. The method includes the following steps of arranging a multi-element sensor on site, transmitting detection data to a subway on-site data collection server in a wired or wireless mode, filtering da...

Full description

Saved in:
Bibliographic Details
Main Authors XU SHAOHUA, LIN YUECHUN, ZHAO LEI
Format Patent
LanguageEnglish
Published 20.05.2015
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a rapid subway construction risk evaluation method based on a Dasarathy model. The method includes the following steps of arranging a multi-element sensor on site, transmitting detection data to a subway on-site data collection server in a wired or wireless mode, filtering data transmitted back by the multi-element sensor through the subway on-site data collection server, sending the processed data to a risk evaluation server, classifying and integrating the detection data sent back by the subway on-site data collection server through the risk evaluation server, converting the data into a data array suitable for being calculated through a Dasarathy model fusion method, conducting risk evaluation on the data through the risk evaluation server by means of the Dasarathy model fusion method, sending the rapid risk evaluation result to a detection and monitoring central computer, and conducting the further processing through a computer central processing unit. The method has the advantages that use is convenient, the processing speed is high, and the technology achievement is easy.
Bibliography:Application Number: CN20131552459